Test Plan Template..

Test plan template, based on IEEE 829 format.

  1. Test Plan Identifier (TPI) –  For example: “Master plan for 3A USB Host Mass Storage Driver TP_3A1.0”

    Some type of unique company generated number to identify this test plan, its level and the level of software that it is related to. Preferably the test plan level will be the same as the related software level. The number may also identify whether the test plan is a Master plan, a Level plan, an integration plan or whichever plan level it represents. This is to assist in coordinating software and testware versions within configuration management.  Keep in mind that test plans are like other software documentation, they are dynamic in nature and must be kept up to date. Therefore, they will have revision numbers. You may want to include author and contact information including the revision history information as part of either the identifier section of as part of the introduction.

  2. References – Documents that are referenced include:-Project Plan, System Requirements specifications, High level design document, Detail design document, Development and Test process standards, Methodology, Low level design
  3. Introduction
  4. Test Items
  5. Software Risk Issue
  6. Features To Be Tested
  7. Features Not To Be Tested
  8. Approach
  9. Item Pass/Fail Criteria
  10. Entry & Exit Criteria
  11. Suspension Criteria and Resumption Requirements
  12. Test Deliverables
  13. Remaining Test Tasks
  14. Environmental Needs
  15. Staffing and Training Needs
  16. Responsibilities
  17. Planning Risks and Contingencies
  18. Approvals
  19. Glossary

V MODEL

V model, a software development life cycle methodology.

It is known as verification and validation model Validation answers the question – “Are we developing the product which attempts all that user needs from this software ?” and Verification answers the question– “Are we developing this product by firmly following all design specifications ?”

Usablity Testing..!!

Usability testing, a non-functional testing technique that is a measure of how easily the system can be used by end users. It is difficult to evaluate and measure but can be evaluated based on the below parameters:

  • Level of Skill required to learn/use the software. It should maintain the balance for both novice and expert user.
  • Time required to get used to in using the software.
  • The measure of increase in user productivity if any.
  • Assessment of a user’s attitude towards using the software.

User Acceptance Testing..!!

User acceptance testing, a testing methodology where the clients/end users involved in testing the product to validate the product against their requirements. It is performed at client location at developer’s site.

For industry such as medicine or aviation industry, contract and regulatory compliance testing and operational acceptance testing is also carried out as part of user acceptance testing.

UAT is context dependent and the UAT plans are prepared based on the requirements and NOT mandatory to execute all kinds of user acceptance tests and even coordinated and contributed by testing team.

Beta Testing..!!

Beta testing also known as user testing takes place at the end users site by the end users to validate the usability, functionality, compatibility, and reliability testing.

Beta testing adds value to the software development life cycle as it allows the “real” customer an opportunity to provide inputs into the design, functionality, and usability of a product. These inputs are not only critical to the success of the product but also an investment into future products when the gathered data is managed effectively.

Acceptance Testing..

Acceptance testing, a testing technique performed to determine whether or not the software system has met the requirement specifications. The main purpose of this test is to evaluate the system’s compliance with the business requirements and verify if it is has met the required criteria for delivery to end users.

There are various forms of acceptance testing:

Industry Workflow – Testing workflow Real Time..

Software Development Life Cycle :

-Requirements
-Design
-Coding
-Testing
-Release
-Maintenance

Business Analyst(BA) gathers the Requirements of the project and prepares requirement document(BRD)/Usecases –
which explains how the user is going to use/interact the application
– Then the BRD will be given to both Developing Team and Testing Team.

Developing Team codes the application – Design Phase.

-Program Manager/Team Lead – will assign work to Developers – Dev1, Dev2

Example: -Design :

-Dev1: Login
-Dev2: Check balance

-Design document/Technical Document : Each developer prepares design document
-Snapshots of application
-look and feel application
NOTE: No Logic will be coded in Design document phase.

-Based on the design, Development team gonna write/build the code..Example: builds code for Login Action.

-After writing logic code for the login action, Developer do Unit/Module/Component Testing (White-Box Testing)

– After code works fine, developer stores the code on Server like SVN Server

– Unit Codes like login, check balance will be place on the server and INTEGRATE it to build the entire
application.

Question is who will Integrate this unit code to build the application..??

– Build Management Team/Release Team will Integrate the code and build the application. After complete
build, they will Prepare Setup.exe file.

Then comes the role of Testers:

Program manager assigns the task to Each Testers.

Tester1: Check_Login, Check balance
Tester2: Transfer Money, Update Profile

Then, QA gets SETUP.EXE from Build Management Team/Release Team
– Tester should install the application by double clicking the Setup.exe file .
– After launching the Application, first test would be SMOKE TEST/SANITY TEST/ADHOC TEST/SHAKE OUT TEST/TEMP TEST

Why SMOKE TEST??

Example: If we want to buy a car, we will go for test drive, to check the basic condition of the car.. to check
how comfortable is??

-For http://www.bankofamerica.com, the basic functionalities would be: how does the login work, how is check
balance, how is transfer money?? etc..

– While performing Smoke Testing, if Login functionality doesnot work properly, then that would be a ShowsTopper
–Smoke Testing will be performed to check the STABILITY of the build/application.

-After the build is stable, QA performs:

– FUNCTIONAL/ GUI /BLACK BOX TESTING
– Integration test/WorkFlow test
-Integrating different Units of the application

MS SQL SERVER 4.0 HRESULT 0xc8000222 Error and Dot NET Framework 4.0 Installation Failure, FIXED

1.) Open Command Prompt in Administrator Mode.

2.) Type “net stop WuAuServ” (This will Disable Windows update).

3.) Goto to Run ( Win+R ) and type in “%windir%” (This command will open your microsoft windows system folder).

4.) Find the folder “SoftwareDistribution” and rename it as “SDold”.

5.) Then, go back the command prompt and run the command “net start WuAuServ”. (This will Enable Windows update)

6.) Now, try to install Dot NET Framework again.

7.) Done.